Blog

Oil and gas equipment insights

Practical notes on selecting, specifying, inspecting and buying oil and gas equipment, written for engineers and buyers in the GCC.

  • Cathodic protection
  • Pipelines
  • Corrosion

Cathodic Protection Pipeline Design for Desert and Sabkha Soils

Cathodic protection for pipelines in desert sand and sabkha: coatings, galvanic vs ICCP, groundbeds, ISO 15589-1 criteria, interference and monitoring.

· 6 min read

  • Materials
  • Stainless steel
  • Offshore

Duplex vs Super Duplex vs 316L for Offshore Piping

Duplex vs super duplex vs 316L for seawater and produced water: PREN, chloride limits, ISO 15156-3 sour limits, HISC, welding and cost.

· 6 min read

  • ESP
  • Artificial lift
  • Spares planning

ESP Failure Causes in Hot, Gassy and Sandy Wells

Why ESPs fail in hot, gassy and sandy wells: overheating, gas lock, abrasion, cable and VSD issues, teardown analysis and a critical spares checklist.

· 6 min read

  • Hazardous area
  • IECEx
  • ATEX

Hazardous Area Equipment UAE: IECEx vs ATEX Selection Guide

How to select hazardous area equipment in the UAE and GCC: zones, gas groups, T-classes, EPL, Ex d/e/i, high-ambient ratings and IECEx vs ATEX.

· 6 min read

  • Sour service
  • Line pipe
  • Testing

HIC Test for Line Pipe: HIC and SSC Testing for Sour Service

HIC test for sour line pipe: NACE TM0284 CLR/CTR/CSR limits in API 5L Annex H, TM0177 SSC four-point bend, solutions A/B and PO requirements.

· 5 min read

  • Fugitive emissions
  • Valves
  • ISO 15848

Low Emission Valves: ISO 15848, API 622, API 624 and API 641

Low emission valves explained: ISO 15848-1/-2 tightness, endurance and temperature classes, API 622 packing, API 624 and API 641, and how to specify them.

· 5 min read

  • Procurement
  • Lead Time
  • OCTG

Oil and Gas Equipment Lead Time: Why It's Long and How to Cut It

Why oil and gas equipment lead times run long, from forgings and mill rolling to approvals, and practical ways UAE and GCC buyers can shorten them.

· 5 min read

  • Sour service
  • Valves
  • NACE MR0175

Sour Service Valves: How to Select Valves for H2S Gas

How to specify sour service valves for H2S gas: NACE MR0175/ISO 15156 materials, hardness limits, valve type, RGD-rated seals, testing and documents.

· 6 min read

  • Inspection
  • Quality
  • Procurement

Third Party Inspection in Oil and Gas: What Buyers Should Specify

How to specify third party inspection for oil and gas valves, wellheads and line pipe: ITPs, hold points, NDE, hydrotest and EN 10204 3.2.

· 6 min read

  • Wellheads
  • API 6A
  • Maintenance

Wellhead Spare Parts and Maintenance Planning for Mature Fields

Plan wellhead spare parts for mature fields: gate valve servicing, seat and packing wear, ring gaskets, legacy equipment ID, spares matrix and API 6AR.

· 6 min read

Have an RFQ or material list?

Email sales@safinatlulua.com or send an enquiry. We typically respond within one business day.

Request a Quote